Dairyland Power Drops Plan for Gas Plant on Lake Superior
In short
- Dairyland Power Coop cancelled plans for the Nemadji Trail Energy Center in Superior, Wisconsin.
- The 625 MW natural gas plant was proposed for the shores of Lake Superior.
- The utility asked the Wisconsin Public Service Commission to withdraw the plant's permits.
Why it's good news
The plant had faced years of objection from the community living beside the lake. Dairyland Power has now withdrawn the project and asked regulators to cancel its permits. The source text is cut off, so details of the reasons and next steps are not confirmed here.
From CleanTechnica
SUPERIOR, Wisconsin โ Today, Dairyland Power Coop announced the cancellation of plans for NTEC, which was proposed to be built on the shores of Lake Superior, and asked the Wisconsin Public Service Commission (PSC) to withdraw its permits. The Nemadji Trail Energy Center (NTEC), a 625 MW natural gas plant, has ... [continued] The post After Years-Long Community Objection, Dairyland Power Pulls the Plug on NTEC Gas Plant appeared first on CleanTechnica .
Ask this story
For kids
A power company had a plan to build a big gas power plant by Lake Superior. Many people in the community said no for a long time. Now the company has stopped the plan.